References

Jensen Metal

Project’s Description: Central welding robot cabins ventilation system

Project’s Volume: 6 Welding robot cabins, total capacity 28 000   m3/hr , installed power 37,5 kW. Welding somke extraction and filtration unit equipped with suppresive fire extinquishing sistem and oil particles antisticking precoating material injection system.

Location:
 Liepaja

Year Executed: 2021

Show product
Share: